Retain Ring - Flange Connection Procedure
The retain ring flange connection consists of machined pipe, retain ring flanges, retain rings, ‘o’ ring seal retainer and bolting hardware.

Step 1: Pipe supplied with butt end machined
along with an annular groove on the outside
diameter.
|

Step 2: Slip flange onto the pipe.
|

Step 3: Retain ring is sprung over the pipe’s
outside diameter nesting in the annular groove.
|

Step 4: Select the correct 'o' ring seal retainer
style (reference pages C4 -C5). The 'o' ring
provides a seal against the butt end of the pipe.
|

Step 5: Select the required bolting hardware
from Section R of this catalogue. Carefully
place the ‘o’ ring seal retainer in between the
pipe ends. Slide the flanges forward and the
‘o’ ring seal retainer becomes captive within
the flanges.
|

Step 6: Tighten bolts to the torque values
specified. Always tighten bolts in a cross-over
sequence and ensure that the flanges are
parallel.
|
|
Upcoming Events
22-24 May 2012
NAVALIA 2012 (NAVALIA International Shipbuilding Exhibition 2012), Vigo, Spain. Booth #: 1-78
04-07 Sept 2012
SMM 2012 (Shipbuilding Machinery & Marine Technology International Trade Fair), Hamburg, Germany. Booth #: A1-502
27-30 Nov 2012
OSEA 2012 (The 19th International Oil & Gas Industry Exhibition & Conference), Marina Bay Sands, Singapore. Booth #: T.B.A.
TMI Corporate News
15 September 2011
New Representative in Colombia...
01 September 2011
New Representative in Dubai...
08 December 2010
New Representative in China...
01 December 2010
Tube-Mac Spain is moving...
19 August 2010
New Distributor in Norway...
10 November 2009
PYPLOK® fittings receive DNV Certification...
21 September 2009
First tug boat vessel complete in Spain...
Tube-Mac News Archive
|